StrataMinds AI

Service 03 — Cloud Architecture

Infrastructure thatscales with you.

We design cloud platforms the way we run our own: multi-tenant, observable, and reproducible from code. Whether you are migrating from on-premise servers or untangling an existing cloud bill, the goal is the same — reliable systems that cost what they should.

[01]What we deliver

Cloud migration

Planned moves from on-premise or between providers, sequenced to avoid downtime.

Infrastructure as code

Every environment defined in Terraform or CDK — reviewable, repeatable, and recoverable.

Serverless architecture

Event-driven services that scale to zero when idle and absorb spikes without manual intervention.

Multi-cloud strategy

Provider choices made on cost, compliance, and latency rather than habit.

[02]How we approach it

Engineered in layers.

  1. 01

    Assess

    An inventory of workloads, dependencies, costs, and risks before anything moves.

  2. 02

    Build the landing zone

    Accounts, networking, identity, and guardrails set up once and correctly.

  3. 03

    Operate and optimise

    Monitoring, alerting, backups, and regular cost reviews after go-live.

Technology

  • AWS
  • Azure
  • Google Cloud
  • Terraform
  • Docker
  • Kubernetes

Industries

  • Finance
  • Retail
  • Logistics
  • Healthcare
  • Education

Proven in production

We build and run StrataMax — a multi-tenant SaaS platform managing 4,800+ security personnel — on the same practices we bring to client work.

See StrataMax
[03]Questions

Cloud Architecture, answered.

Which cloud providers does StrataMinds AI work with?

StrataMinds AI designs and operates infrastructure on AWS, Microsoft Azure, and Google Cloud, and recommends a provider based on cost, compliance, and latency requirements.

Can you reduce our existing cloud costs?

Often, yes. A cost review covers rightsizing, reserved capacity, storage tiers, and architecture changes, and every recommendation comes with its expected saving and trade-offs.

Will migration cause downtime?

Migrations are planned in stages with rollback points, so most workloads move with little or no downtime. Any unavoidable cut-over is scheduled with your team in advance.

Let's talk aboutwhat you're building.

Every inquiry is answered by an engineer, not a sales script — within one business day.